Skip to content
Kirewa Solar Powered Borehole

The project, with a 40m3 reservoir, and 6 water points (5 Public Stand Posts and 2-yard connection) is expected to serve 360 households (about 1800 people) from Mwenge Parish, Kirewa Sub County.

The project scope includes a Distribution line, a pressed steel water tank of 40m3 on a 12m tower, 1 pump house, solar panel installation, submersible pump installation, intensification, fencing of the source and fencing of the reservoir tank.